New 35,000-sq.-ft., three-story, cGMP peptide manufacturing facility, with laboratory, office and conference spaces. The steel moment frame building was connected to an existing laboratory facility and separated by a seismic joint. The existing lab facility underwent exterior and interior renovation.
Sitework included an equipment yard, roadways, landscaping and irrigation, bioswales and new utilities. The facility is located in a cul-de-sac, which received new asphalt concrete and sidewalks in order to provide proper storm drainage and accessible paths of travel to the buildings.
Project challenges included a fast-track schedule for the 1st floor of less than eight months from demolition to completion of the new building. Additionally, Level 10 developed phasing plans and value engineered the project to meet CS Bio’s operational and budget objectives. Design-build MEPF, skin and exterior framing. LEED Gold.
Related Services
Preconstruction
Design Assist/Design-Build MEP+
Sustainability
Media Gallery (2)
LEED® Gold
EMAIL UPDATES
Signup with your email address below and we will keep you up to date on the latest Level 10 Construction news and project achievements (new , recently completed, awards and recognition)
Thank you for signing up
Project Executive
Email Doug Collins
Thank you for your message.
We appreciate you taking the time to reach out.
If the nature of your inquiry requires follow up we will reach out to you as soon as possible.