Approximately 1,300 sq. ft. of renovated laboratory space, designed around physics and laser experiments. Work included demolition of existing finishes and MEP systems, and installation of new casework, fume hood, MEP systems, overhead unistrut equipment racks and architectural finishes.
The project was delivered under a lump sum design-build process, which was a new delivery model for UCSD. To satisfy the client’s needs, the project had an aggressive schedule with just over 90 days for the construction phase.
Related Services
Preconstruction
Design-Build
Design Assist/Design-Build MEP+
Sustainability
LEED® Platinum
EMAIL UPDATES
Signup with your email address below and we will keep you up to date on the latest Level 10 Construction news and project achievements (new , recently completed, awards and recognition)
Thank you for signing up
Project Executive
Email Mike Conroy
Thank you for your message.
We appreciate you taking the time to reach out.
If the nature of your inquiry requires follow up we will reach out to you as soon as possible.
Similar Projects
University of San Diego
Manchester Hall Conference Center Remodel San Diego, CA13,864-sq.-ft. interior tenant improvement includes new entry colonnade with all-glass curtainwall.
Project Key:
University of San Diego
Loma Hall Level 1 Alterations San Diego, CA11,654-sq.-ft. tenant improvement of an occupied facility creates a showcase space for Engineering Department.
Project Key: