180,000 SF renovation of an existing warehouse into Class A office space with training rooms, full-service kitchen, and event space.

The entire structure and slab of the project was removed and built back to raise the building above the flood plain and to increase the structural capacity of the roof to allow for the MEP equipment and seismic loads. Only the exterior walls were saved and needed to be braced to reuse them. Design-Build MEP. LEED Gold.

Related Services

Preconstruction

Design Assist/Design-Build MEP+

Building Information Modeling

LEED® Gold

EMAIL UPDATES

Signup with your email address below and we will keep you up to date on the latest Level 10 Construction news and project achievements (new , recently completed, awards and recognition)

Thank you for signing up

Project Executive

Leigh Askew

Partner/Director of MEP Services