In The News March 3, 2021

Core Value

Source: Modern Steel Construction

Modern Steel Construction discusses SpeedCore, the revolutionary core erection process being used to build Level 1o’s 200 Park project in downtown San Jose. 200 Park, a 19-story high-rise, is the first project in California (and the 2nd in the U.S.) to use SpeedCore for building the structural core. SpeedCore replaces the traditional system of building a high-rise core (reinforced concrete)  with a “sandwich-type” system using prefabricated steel plates connected with welded tie bars and later filled with concrete. Read more by clicking on the link below.

Link to Original Article (may require registration) https://lsc-pagepro.mydigitalpublication.com/publication/?i=693043&article_id=3901120&view=articleBrowser&ver=html5