New 35,000-sq.-ft.,three-story, cGMP peptide manufacturing facility, with laboratory, clean rooms, office and conference spaces.

The steel moment frame building was connected to an existing laboratory facility and separated by a seismic joint. The existing lab facility underwent exterior and interior renovation. Sitework included an equipment yard, roadways, landscaping and irrigation, bioswales and new utilities.

The facility is located in a cul-de-sac, which received new asphalt concrete and sidewalks in order to provide proper storm drainage and accessible paths of travel to the buildings.

Design-build MEPF, skin and exterior framing. LEED Gold.

Related Services

Preconstruction

Design Assist/Design-Build MEP+

Sustainability

LEED® Gold

EMAIL UPDATES

Signup with your email address below and we will keep you up to date on the latest Level 10 Construction news and project achievements (new , recently completed, awards and recognition)

Thank you for signing up

Project Executive

Doug Collins

Partner/VP Operations
My Ebook (0) + Save- Remove ? Help