202,434-sq.-ft., four-story, cast-in-place, post-tensioned concrete parking structure with 668 ground and upper level parking stalls.

Its foundations consist of pile cap and grade beam footings with 353 63-ft. pre-cast piles.The project’s significant sustainability efforts include the use of fly ask (steel-manufacturing waste material) in the concrete mix design. Design-build MEPF. LEED Gold.