Oracle occupies both the 9515 Towne Centre Drive building and the 1st floor of the 9525 Towne Centre Drive building. This project consolidates all of the headcount and services for the 9525 location into the 9515 location.
9515 Towne Centre Drive consists of two stories with 31,706 SF per floor. The lab functions for the site were consolidated within the existing 1st floor, and the 2nd floor has been reconfigured to a higher density headcount space (no lab space on this floor). There was also work outside the building associated with the replacement of the MEP systems.
The 65,000 SF project included R&D dry bench electronics lab space, Class 5 clean rooms and a data center relocation.
The site remained fully occupied during the remodel. As such, the project was broken into phases to limit impact to the users of the facility. Any disruptive work or shutdowns were handled off hours. The Oracle team completed this technically and logistically challenging project one day ahead of schedule.
Related Services
Preconstruction
Design Assist/Design-Build MEP+
Building Information Modeling
Media Gallery (5)
Unique Challenges & Solution
CHALLENGES
Fast-Track Schedule
Occupied Campus
LEED® Certified
EMAIL UPDATES
Signup with your email address below and we will keep you up to date on the latest Level 10 Construction news and project achievements (new , recently completed, awards and recognition)
Thank you for signing up
Project Executive
Email Mike Conroy
Thank you for your message.
We appreciate you taking the time to reach out.
If the nature of your inquiry requires follow up we will reach out to you as soon as possible.
Similar Projects
Nextivity
Nextivity Tenant Improvement San Diego, California27,167 SF TI with office space and 4,636 SF lab space.
OncoSec
OncoSec Tenant Improvement San Diego, CASan Diego Architectural Foundation's Orchid Winner 2017.
24,705 SF tenant improvement, including demolition, in occupied facility.
Jay Paul Company
4 Embarcadero Center 36th Floor TI San Francisco, CALogistically challenging tenant improvement on the 36th floor of an occupied, urban high-rise. 4 Embarcadero was completed in 11 weeks.