Redevelopment of an 18-acre site at the intersection of Central Expressway and Wolfe Road in Sunnyvale into a creative and innovative campus for a leading-edge technology company.

New 882,857-sq.-ft. design-build campus is comprised of three 6-story connected buildings, each containing two levels of podium parking and four levels of office space; a one-story stand-alone amenities building; and a 7-story free-standing parking structure with 1,540 parking stalls (totaling 518,175-sq.-ft.). The third floor of each of the three connected buildings will have exterior occupiable spaces at the perimeter of the building, as well as open-to-the-sky courtyards at the core of each sector.

The office buildings and parking garage are post-tensioned concrete structures with nearly  2 million sq. ft. of post-tension deck, including parking structure, parking levels and roofs. Level 10 self-performed the parking structure formwork, foundation concrete and vertical concrete placement.

Sustainability: Surface parking was eliminated through the use of under-building podium parking and a stand-alone garage. Eliminating surface parking allowed for the preservation of 53% of the 18-acre site area as open space. Total of 995 podium parking stalls; 359 on B1 podium totaling 156,446-sq.-ft., 321 on B2 podium totaling145,112-sq.-ft., and 315 on B3 podium totaling 144,316-sq.-ft.

LEED Platinum.

Related Services

Preconstruction

Design-Build

Design Assist/Design-Build MEP+

Building Information Modeling

Self-Perform Work

Sustainability

LEED® Platinum

EMAIL UPDATES