Redevelopment of an 18-acre site at the intersection of Central Expressway and Wolfe Road in Sunnyvale into a creative and innovative campus for a leading-edge technology company.

New 882,857 SF design-build campus is comprised of three 6-story connected buildings, each containing two levels of podium parking and four levels of office space; a one-story stand-alone amenities building; and a 7-story free-standing parking structure with 1,540 parking stalls (totaling 518,175 SF). The third floor of each of the three connected buildings will have exterior occupiable spaces at the perimeter of the building, as well as open-to-the-sky courtyards at the core of each sector.

The office buildings and parking garage are post-tensioned concrete structures with nearly  2 million sq. ft. of post-tension deck, including parking structure, parking levels and roofs. Level 10 self-performed the parking structure formwork, foundation concrete and vertical concrete placement.

Sustainability: Surface parking was eliminated through the use of under-building podium parking and a stand-alone garage. Eliminating surface parking allowed for the preservation of 53% of the 18-acre site area as open space. Total of 995 podium parking stalls; 359 on B1 podium totaling 156,446 SF, 321 on B2 podium totaling145,112-sq.-ft., and 315 on B3 podium totaling 144,316 SF.

LEED Platinum.

Related Services

Preconstruction

Design-Build

Design Assist/Design-Build MEP+

Building Information Modeling

Self-Perform Work

Sustainability

LEED® Platinum

EMAIL UPDATES

Signup with your email address below and we will keep you up to date on the latest Level 10 Construction news and project achievements (new , recently completed, awards and recognition)

Thank you for signing up

Project Executive

Casey Wend

Partner/Senior VP/Chief Operating Officer